Preparation of the model of Zr fuel rod cladding failure due to DHC
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F26722445%3A_____%2F12%3A%230000857" target="_blank" >RIV/26722445:_____/12:#0000857 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Preparation of the model of Zr fuel rod cladding failure due to DHC
Original language description
In this report preparation of a first version of delayed hydride cracking model is described. In the first two parts delayed hydride cracking mechanism is described generally. In the third part three best-known models from Kim, Puls and Jernkvist, are presented. In the last part table of parameters entering to DHC models is given.
Czech name
—
Czech description
—
Classification
Type
V<sub>souhrn</sub> - Summary research report
CEP classification
JF - Nuclear energy
OECD FORD branch
—
Result continuities
Project
—
Continuities
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Others
Publication year
2012
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data specific for result type
Number of pages
28
Place of publication
Řež
Publisher/client name
ÚJV Řež, a. s.
Version
—