Optimalization of Steam Control Station
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F44555601%3A13420%2F18%3A43894204" target="_blank" >RIV/44555601:13420/18:43894204 - isvavai.cz</a>
Result on the web
<a href="http://dx.doi.org/10.1063/1.5049923" target="_blank" >http://dx.doi.org/10.1063/1.5049923</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1063/1.5049923" target="_blank" >10.1063/1.5049923</a>
Alternative languages
Result language
angličtina
Original language name
Optimalization of Steam Control Station
Original language description
The article deals with the design of a new reduction station. The station serves for backup heating of the hot water heat exchangers. The hot water heating network of the Ledvice power plant is the main system. Back-up rating system has been developed with regard to the enhancement of the heat demand by 1.5 MWt. The existing fluid block and the new supercritical block equipped by granular boiler will be used as a new source of the heat. The main fuel of the boiler is brown coal. A new control station for a steam reduction (demanded for heating of a hot-water circuit) is described.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20301 - Mechanical engineering
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2018
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Procedia Engineering
ISBN
—
ISSN
1877-7058
e-ISSN
neuvedeno
Number of pages
4
Pages from-to
1-4
Publisher name
Elsevier Science BV
Place of publication
Amsterdam
Event location
Štúrovo, Slovensko
Event date
Jun 27, 2018
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—