All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Towards Sporadic Demand Stock Management Based on Simulation with Single Reorder Point Estimation

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F46747885%3A24310%2F25%3A00012863" target="_blank" >RIV/46747885:24310/25:00012863 - isvavai.cz</a>

  • Result on the web

    <a href="https://dspace.tul.cz/server/api/core/bitstreams/bfbf0c8d-d126-4342-a749-7a8a76c87c91/content" target="_blank" >https://dspace.tul.cz/server/api/core/bitstreams/bfbf0c8d-d126-4342-a749-7a8a76c87c91/content</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.15240/tul/001/2025-5-002" target="_blank" >10.15240/tul/001/2025-5-002</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Towards Sporadic Demand Stock Management Based on Simulation with Single Reorder Point Estimation

  • Original language description

    The goal of this paper is to decide whether bootstrapping and/or linear regression are suitable to estimate an initial reorder point in sporadic demand stock management based on past stock movement simulation (PSMS) in combination with neighborhood search-oriented optimization. Thus, we randomly generate demand data including 20–80% zero demand periods and simulate continuous review, fixed order quantity inventory control policy (R, Q) for 4 different arrangements of PSMS combined with local search (LS) with a number of bootstrapping sampling runs ranging from 5 to 500. The original idea of LS is to underestimate order lead time demand using linear regression (LR), overestimate lead time demand with the help of bootstrapping (B) and search the generated interval using PSMS to return R, Q with the optimal trade-off between inventory costs and service level. The outputs gained from simulation experiments show that avoiding the generation of overestimated reorder point with B seems to be a more sensible choice as the consumption of computational time is significantly higher than in case of LR. On the other hand, using an LR based initial reorder point may require the exploration of neighborhood in both directions, while B rather enables a more efficient one-way search as it suffers from significantly less blindness caused by PSMS compensating underestimated order lead time demand with increased replenishment orders. Furthermore, estimating just one initial reorder point brings a better opportunity to control the consumption of computational time through assigning a certain amount of computational time to every change of the initial reorder point, as a time to evaluate a single R, Q combination via PSMS is relatively stable.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    50200 - Economics and Business

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2025

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    E+M Ekonomie a Management>

  • ISSN

    1212-3609

  • e-ISSN

  • Volume of the periodical

    28

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    CZ - CZECH REPUBLIC

  • Number of pages

    14

  • Pages from-to

    67-80

  • UT code for WoS article

    001392134800001

  • EID of the result in the Scopus database

    2-s2.0-105008469264