Assessment of AK-2 boiler unit No. 3, SWCC Al Khobar
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F47718684%3A_____%2F14%3A%230000618" target="_blank" >RIV/47718684:_____/14:#0000618 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Assessment of AK-2 boiler unit No. 3, SWCC Al Khobar
Original language description
The report summarizes works and results of NDT inspection of AK-2 boiler unit No. 3 SWCC Al Khobar. General objective of the work is to make life assessment of the boiler unit to determine the remaining life for preparing the scope of work for extending the life time by 15 years. The activities performed by VZU Plzeň have been focused on NDT inspection of specified parts of boilers and material analyses (including creep test) of tube samples removed from the boiler.
Czech name
—
Czech description
—
Classification
Type
V<sub>souhrn</sub> - Summary research report
CEP classification
JE - Non-nuclear power engineering, energy consumption and utilization
OECD FORD branch
—
Result continuities
Project
—
Continuities
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Others
Publication year
2014
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data specific for result type
Number of pages
159
Place of publication
Plzeň
Publisher/client name
Babcock Borsing Service Arabia Ltd.
Version
—