Using of the digital factory concept in the pre-project phase
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23210%2F11%3A43896784" target="_blank" >RIV/49777513:23210/11:43896784 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Using of the digital factory concept in the pre-project phase
Original language description
This contribution is focused on using the concept of digital factory in the planning phase, specifically on setting operation times in a packing workplace. Times are set by two methods, MTM1 and UAS. After this planning phase, the process is simulated ina virtual environment. After simulations and experiments with virtual workplace, we created a real workplace, and conducted real experiments. At the end of the paper is a comparison between real and virtual workplaces.
Czech name
—
Czech description
—
Classification
Type
O - Miscellaneous
CEP classification
JP - Industrial processes and processing
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/GD402%2F08%2FH051" target="_blank" >GD402/08/H051: Optimizing of multidisciplinary designing and modelling of production system of virtual firms</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2011
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů