All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Energy storage savings depended on recuperation ratio in traction

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F16%3A43928804" target="_blank" >RIV/49777513:23220/16:43928804 - isvavai.cz</a>

  • Result on the web

    <a href="http://ieeexplore.ieee.org/document/7512099/" target="_blank" >http://ieeexplore.ieee.org/document/7512099/</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/ELEKTRO.2016.7512099" target="_blank" >10.1109/ELEKTRO.2016.7512099</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Energy storage savings depended on recuperation ratio in traction

  • Original language description

    Performance of future electric traction systems can be improved by energy storage system (ESS). Using of ESS is not advantageous in all cases. Additional losses always occur during the ESS operation. If saved energy is relatively low in comparison with these losses, the return of investment will not be reached. This paper is focused on energy storage on-board tram vehicle. Return on investment determination is not trivial for multi-source/load systems like a tram. The main emphasis of proposed research is given to the energy savings in dependency on recuperation ratio in tram line. One of main energy savings influencing factors is power management (PM) strategy of ESS. Therefore five PM strategies were taken in to account for energy savings calculation. Four of PM strategies are basic and one is more sophisticated. This sophisticated strategy is based on the Takagi-Sugeno Fuzzy controller (T-S Fuzzy). T-S Fuzzy strategy uses knowledge of the tram line and tram position by GPS. All these strategies were simulated at the same tram line via stochastic tram line model.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JA - Electronics and optoelectronics

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/LO1607" target="_blank" >LO1607: RICE - New technologies and concepts for smart industrial system</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    11th International Conference Elektro 2016 : proceedings

  • ISBN

    978-1-4673-8698-2

  • ISSN

  • e-ISSN

  • Number of pages

    4

  • Pages from-to

    370-373

  • Publisher name

    IEEE

  • Place of publication

    Piscataway

  • Event location

    Štrbské Pleso, Slovensko

  • Event date

    May 16, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000386959800075