All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

DEVELOPMENT OF WATER TECHNICAL INFRASTRUCTURE IN NEWLY ESTABLISHED BUILT-UP AREAS OF SMALL MUNICIPALITIES (CASE STUDY SOUTH BOHEMIAN REGION)

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60076658%3A12220%2F23%3A43907470" target="_blank" >RIV/60076658:12220/23:43907470 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.5593/sgem2023/2.1/s11.41" target="_blank" >http://dx.doi.org/10.5593/sgem2023/2.1/s11.41</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.5593/sgem2023/2.1/s11.41" target="_blank" >10.5593/sgem2023/2.1/s11.41</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    DEVELOPMENT OF WATER TECHNICAL INFRASTRUCTURE IN NEWLY ESTABLISHED BUILT-UP AREAS OF SMALL MUNICIPALITIES (CASE STUDY SOUTH BOHEMIAN REGION)

  • Original language description

    An essential part of the development of municipalities is an investment in a properly functioning technical infrastructure. In addition to today&apos;s standard connection to the development of electricity, new investments in technical infrastructure related to the aquatic environment are also required concerning the interests of nature and especially the ecological hairline of water components. Many smaller municipalities are still not solved by sewerage of residential houses and other buildings, especially agricultural production, nor in municipalities that can connect to the municipal sewer system, often missing equipment for wastewater treatment (wastewater treatment plant). Regarding human health, the absence of a publicly available drinking water source for all settlements in municipalities is also alarming. As part of this Case Study, 14 municipalities across the South Bohemian Region (Czech Republic) were accidentally chosen, regardless of their size, location, proximity to larger settlements, etc. The study found that a significant percentage of municipalities suffer from severe shortcomings in connection to water infrastructure. The development plans of these municipalities were assessed, which always plan to develop built-up areas for various purposes, especially for housing. The alarming conclusion is that there is a considerable percentage of settlements that, despite the unfavourable situation in the water infrastructure, have no solution to the situation incorporated into the development of the municipality. These municipalities leave all activities only to their citizens.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    50702 - Urban studies (planning and development)

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceedings of 23rd International Multidisciplinary Scientific GeoConference SGEM 2023

  • ISBN

  • ISSN

    1314-2704

  • e-ISSN

    1314-2704

  • Number of pages

    8

  • Pages from-to

    325-332

  • Publisher name

    International Multidisciplinary Scientific Geoconference

  • Place of publication

    Albena

  • Event location

    Albena

  • Event date

    Jul 3, 2023

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article