Specific Aspects of Bridge Construction in the Central African Republic
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60162694%3AG43__%2F16%3A00533686" target="_blank" >RIV/60162694:G43__/16:00533686 - isvavai.cz</a>
Result on the web
<a href="http://vavtest.unob.cz/registr" target="_blank" >http://vavtest.unob.cz/registr</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3849/aimt.01139" target="_blank" >10.3849/aimt.01139</a>
Alternative languages
Result language
angličtina
Original language name
Specific Aspects of Bridge Construction in the Central African Republic
Original language description
The paper deals with an operation of Italian engineers in Central African Republic (CAR). The aim of the operation was to construct the temporary bridge. This operation was supported by 15th Engineering Regiment and the University of Defence. Two soldiers from the 15th Engineering Regiment were sent to CAR to help Italian engineers. During this operation REACH-BACK concept between University of Defence and 15th Engineer Regiment was used. Communication and cooperation between these units was supported by Information Portal of Engineer Corps. The portal works as a support element for REACH-BACK concept.
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
KA - Militarism
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Advances in Military Technology
ISSN
1802-2308
e-ISSN
—
Volume of the periodical
11
Issue of the periodical within the volume
2
Country of publishing house
CZ - CZECH REPUBLIC
Number of pages
8
Pages from-to
253-260
UT code for WoS article
—
EID of the result in the Scopus database
—