All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The concept comparison of BORM Points method with Use Case Points

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41110%2F07%3A20005" target="_blank" >RIV/60460709:41110/07:20005 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    The concept comparison of BORM Points method with Use Case Points

  • Original language description

    The main objective of this article is to introduce a new concept of effort estimation method "BORM Points" (BORMp), which is the result of the author´s research. This method belongs to the group of model based method and is concerned with effort estimation for projects developed in BORM method. Following the logic behind "Use Case Points" (UCP), the accepted method effort estimation, BORMp eliminates certain of UCP disadvantages. The first part of the paper provides short introduction to the BORM method(Business and Object Relation Modeling). The second part introduces BORM Points and compares with "Use Case Points".

  • Czech name

    Srovnání konceptu BORM Points s metodou Use Case Points

  • Czech description

    The main objective of this article is to introduce a new concept of effort estimation method "BORM Points" (BORMp), which is the result of the author´s research. This method belongs to the group of model based method and is concerned with effort estimation for projects developed in BORM method. Following the logic behind "Use Case Points" (UCP), the accepted method effort estimation, BORMp eliminates certain of UCP disadvantages. The first part of the paper provides short introduction to the BORM method(Business and Object Relation Modeling). The second part introduces BORM Points and compares with "Use Case Points".

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JC - Computer hardware and software

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/2C06004" target="_blank" >2C06004: Intelligent instruments for evaluation of relevance of content and structure of general and specialised data, information and knowledge sources</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2007

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    PROCEEDINGS OF THE 2007 INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING THEORY AND PRACTICE

  • ISBN

    978-0-9727412-6-2

  • ISSN

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

    29-35

  • Publisher name

    ISRTS - International Society for Research in Science and Technology

  • Place of publication

    Orlando, Florida, USA

  • Event location

    Orlando, Florida, USA

  • Event date

    Jul 9, 2007

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article