All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Alternative harvest scheduling for final cut with respect to silvicultural requirements

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41320%2F07%3A23598" target="_blank" >RIV/60460709:41320/07:23598 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Alternative harvest scheduling for final cut with respect to silvicultural requirements

  • Original language description

    Significant changes in conditions of forest management have been noticed in Slovak forest management during last fifteen years. Even thought shelterwood system is preferred and area of forest management units is much smaller as used to be, the classicalway of allowable cut indicators derived for large units managed by clear-cutting system has been still used in the practice. The paper presents alternative harvest scheduling with respect to shelterwood silvicultural requirements. Proposal five alternatives are solved by integer programming on the example of the forest management unit covers 562.12 ha with the objective of the maximization of total cut volume over planning horizon of 50 years. Obtained results of total cut, flow of area cut and volume cut respectively are compared with two allowable cut indicators: cutting percentage and empirical cutting percentage.

  • Czech name

    Alternativní způsob těžební úpravy s ohledem na pěstební podmínky

  • Czech description

    Significant changes in conditions of forest management have been noticed in Slovak forest management during last fifteen years. Even thought shelterwood system is preferred and area of forest management units is much smaller as used to be, the classicalway of allowable cut indicators derived for large units managed by clear-cutting system has been still used in the practice. The paper presents alternative harvest scheduling with respect to shelterwood silvicultural requirements. Proposal five alternatives are solved by integer programming on the example of the forest management unit covers 562.12 ha with the objective of the maximization of total cut volume over planning horizon of 50 years. Obtained results of total cut, flow of area cut and volume cut respectively are compared with two allowable cut indicators: cutting percentage and empirical cutting percentage.

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    GK - Forestry

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/2B06012" target="_blank" >2B06012: Biodiversity management in the Krkonoše Mts. and Šumava Mts.</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2007

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Lesnicky časopis (Forestry Journal)

  • ISSN

    0323-1046

  • e-ISSN

  • Volume of the periodical

    53

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    SK - SLOVAKIA

  • Number of pages

    11

  • Pages from-to

    117-127

  • UT code for WoS article

  • EID of the result in the Scopus database