All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Time Study and Skidding Capacity of the Wheeled Skidder Timberjack 450C in Caspian Forests

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41320%2F08%3A24006" target="_blank" >RIV/60460709:41320/08:24006 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Time Study and Skidding Capacity of the Wheeled Skidder Timberjack 450C in Caspian Forests

  • Original language description

    This study was carried out on steep and difficult terrain. Trees were logged downhill to the landing by wheeled skidder Timberjack 450C. A selection cutting was performed on 66-hectare tract with an average slope of 30 percent. The elemental time study method was applied to develop the skidding time predicting model. In this study 43 working cycle were collected. Skidding cycle time was mainly affected by skidding distance, winching distance and interaction between skidding distance and slope. The grossand net production rate was 20.51 and 22.93 cubic meter per hour, respectively. The unit cost considering gross and net production rate was 6.31 and 6.22 per cubic meter, respectively.

  • Czech name

    Časová studie a pracovní výkonnost kolového traktoru Timberjack 450C v kaspických lesích

  • Czech description

    This study was carried out on steep and difficult terrain. Trees were logged downhill to the landing by wheeled skidder Timberjack 450C. A selection cutting was performed on 66-hectare tract with an average slope of 30 percent. The elemental time study method was applied to develop the skidding time predicting model. In this study 43 working cycle were collected. Skidding cycle time was mainly affected by skidding distance, winching distance and interaction between skidding distance and slope. The grossand net production rate was 20.51 and 22.93 cubic meter per hour, respectively. The unit cost considering gross and net production rate was 6.31 and 6.22 per cubic meter, respectively.

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    GK - Forestry

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/QC0117" target="_blank" >QC0117: Optimisation of technological and technical parameters of logging-transport systems minimising damages on the ground cover and so reducing the degradation impacts</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2008

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Journal of Forest Science

  • ISSN

    1212-4834

  • e-ISSN

  • Volume of the periodical

    54

  • Issue of the periodical within the volume

    4

  • Country of publishing house

    CZ - CZECH REPUBLIC

  • Number of pages

    6

  • Pages from-to

  • UT code for WoS article

  • EID of the result in the Scopus database