Operation Times in John Deere 1110 E Forwarders in Regeneration Felling
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41320%2F14%3A64941" target="_blank" >RIV/60460709:41320/14:64941 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Operation Times in John Deere 1110 E Forwarders in Regeneration Felling
Original language description
We calculated high-power forwarder productivity in regeneration felling with the objective to set long-term work plans. Based on the time studies of the forwarder operators work operation the operation time consumption was calculated and operation standards for the studied type of forwarder were designed. The standard values were determined based on the volume weight of harvested timber and the forwarding distance. The resulting time consumption required for forwarding 1 m3 of timber, whose mean tree volume is 0,30?0,99 m3 stem?1, and upon forwarding distance of 100?1,000 m ranges from 0.05?0.09 Nhm?3.
Czech name
—
Czech description
—
Classification
Type
J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)
CEP classification
GK - Forestry
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2014
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Journal of Forest Science
ISSN
1212-4834
e-ISSN
—
Volume of the periodical
60
Issue of the periodical within the volume
6
Country of publishing house
CZ - CZECH REPUBLIC
Number of pages
6
Pages from-to
248-253
UT code for WoS article
—
EID of the result in the Scopus database
—