All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Shutdown dose rate analysis for the European TBM system in ITER

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61389005%3A_____%2F12%3A00391474" target="_blank" >RIV/61389005:_____/12:00391474 - isvavai.cz</a>

  • Result on the web

    <a href="http://ac.els-cdn.com/S0920379612000087/1-s2.0-S0920379612000087-main.pdf?_tid=5dbc1c80-9d09-11e2-b0cd-00000aab0f02&acdnat=1365067612_87a914bcde868dedc633d192db7d6b7b" target="_blank" >http://ac.els-cdn.com/S0920379612000087/1-s2.0-S0920379612000087-main.pdf?_tid=5dbc1c80-9d09-11e2-b0cd-00000aab0f02&acdnat=1365067612_87a914bcde868dedc633d192db7d6b7b</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.fusengdes.2012.01.006" target="_blank" >10.1016/j.fusengdes.2012.01.006</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Shutdown dose rate analysis for the European TBM system in ITER

  • Original language description

    ITER will provide one equatorial port for irradiation and performance tests of the European Test Blanket Modules (TBM). The associated port plug integrates the TBM system with attached shield modules and the port plug frame made of steel/water. The TBM system houses two vertically oriented TBMs of the Helium-Cooled Pebble Bed (HCPB) and the Helium-Cooled Lithium-Lead (HCLL) blanket type separated by a water cooled steel wall. Lateral gaps separate the TBMs and the shield modules from the port frame walls. Such gaps have a strong impact on the shielding performance of the entire TBM port system affecting among others the activation of the surrounding materials. During shutdown periods, the activation gives rise to a gamma radiation field which may affect necessary hands-on operations during maintenance and repair services. ITER design rules require the shutdown dose rate level to be less than 100 ?Sv/h after a waiting time of 106 s (to 12 days). Qualified shutdown dose rate calculations

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    BF - Elementary particle theory and high energy physics

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    Z - Vyzkumny zamer (s odkazem do CEZ)

Others

  • Publication year

    2012

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Fusion Engineering and Design

  • ISSN

    0920-3796

  • e-ISSN

  • Volume of the periodical

    87

  • Issue of the periodical within the volume

    5/6

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    5

  • Pages from-to

    493-497

  • UT code for WoS article

    000309781400022

  • EID of the result in the Scopus database