The Influence of Corrosion Processes on the Degradation of Concrete Cover
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F24%3A10255531" target="_blank" >RIV/61989100:27120/24:10255531 - isvavai.cz</a>
Result on the web
<a href="https://www.mdpi.com/1996-1944/17/6/1398" target="_blank" >https://www.mdpi.com/1996-1944/17/6/1398</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3390/ma17061398" target="_blank" >10.3390/ma17061398</a>
Alternative languages
Result language
angličtina
Original language name
The Influence of Corrosion Processes on the Degradation of Concrete Cover
Original language description
In this work, two methods were used to accelerate the corrosion of concrete. In the first method, chloride ions were injected into the concrete using the migration method. The moment of the initiation of the corrosion process was monitored using an electrochemical method of measuring polarization resistance. In the next step, the corrosion process was accelerated by the electrolysis process. Changes on the sample surface were also monitored using a camera. In the second method, the corrosion process of the reinforcing bar was initiated by the use of the electrolysis process only. Here, changes occurring on the surfaces of the tested sample were recorded using two web cameras placed on planes perpendicular to each other. Continuous measurement of the current flowing through the system was carried out in both cases. It was assumed that in conditions of natural corrosion, a crack would occur when the sum of the mass loss of the reinforcing bar due to corrosion reached the same value in tcr(real) (real time) as it reached in the tcr (time of cracking) during the accelerated corrosion test. The real time value was estimated for C1 concrete with cement CEM I. The estimated value was tcr(real) = 1.1 years and for C2 concrete with cement CEM III, tcr(real) = 11.2 years. However, the main difference that was observed during the tests was the nature of the concrete cracks. In the case of the C1 concrete sample, these occurred along the reinforcing bar, while in the C2 concrete, the failures occurred on a perpendicular plane transverse to the direction of the reinforcing bar.
Czech name
—
Czech description
—
Classification
Type
J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
<a href="/en/project/EH22_008%2F0004631" target="_blank" >EH22_008/0004631: Materials and technologies for sustainable development</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2024
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Materials
ISSN
1996-1944
e-ISSN
1996-1944
Volume of the periodical
17
Issue of the periodical within the volume
6
Country of publishing house
CH - SWITZERLAND
Number of pages
21
Pages from-to
"neuvedeno"
UT code for WoS article
001192927100001
EID of the result in the Scopus database
—