All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Key Indicators for the Creation of the TBM Technology Process Model

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F16%3A86097605" target="_blank" >RIV/61989100:27230/16:86097605 - isvavai.cz</a>

  • Result on the web

    <a href="http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7501061" target="_blank" >http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7501061</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/CarpathianCC.2016.7501061" target="_blank" >10.1109/CarpathianCC.2016.7501061</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Key Indicators for the Creation of the TBM Technology Process Model

  • Original language description

    Current information technologies and their subsequent applications in the industry enable a new view on already well-known processes, actions, phenomena and approaches, the realizations of which were very hard or not possible to accomplish nearly a decade ago due to difficult technical and economic conditions. This applies particularly to those areas of the processes industry, which are characterized by massive ecological and environmental load from mining, the metallurgy and the chemical industry. Current information technologies enable us to sense and record data from these processes in hard operation conditions by using new technical remedies in real time, the subsequent storing of the measurement data, their processing and evaluation in situ or in a laboratory. The article describes the use of a full profile tunnel boring machine Wirth TB-II-330H/M using TBM technology during the boring of an exploration gallery of the tunnel Branisko from the east side. According to the used technology it is a very expensive construction and that is the reason that is needed to ensure the fluent and fast course of work progress by maximum mechanism performance and effective work time use. During the boring the tunnel boring machine passed through many geological formations while recording variables like downforce, revolution, the torque of the boring head, power consumption and boring length. The system's monitoring of input and output variables of a tunnel boring machine-rock process system and calculating its key performance indicators (KPI) enable a contribution to the development, design and subsequent evaluation of static and dynamic system models. The indicators of the technological process were designed for visualization in an operator system in order to promptly evaluate, verify, and access data provided by the individual models.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    BC - Theory and management systems

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceedings of the 2016 17th International Carpathian Control Conference, ICCC 2016

  • ISBN

    978-1-4673-8606-7

  • ISSN

  • e-ISSN

  • Number of pages

    4

  • Pages from-to

    25-28

  • Publisher name

    IEEE

  • Place of publication

    Piscataway

  • Event location

    Tatranská Lomnica

  • Event date

    May 29, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article