Key Indicators for the Creation of the TBM Technology Process Model
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F16%3A86097605" target="_blank" >RIV/61989100:27230/16:86097605 - isvavai.cz</a>
Result on the web
<a href="http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7501061" target="_blank" >http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=7501061</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/CarpathianCC.2016.7501061" target="_blank" >10.1109/CarpathianCC.2016.7501061</a>
Alternative languages
Result language
angličtina
Original language name
Key Indicators for the Creation of the TBM Technology Process Model
Original language description
Current information technologies and their subsequent applications in the industry enable a new view on already well-known processes, actions, phenomena and approaches, the realizations of which were very hard or not possible to accomplish nearly a decade ago due to difficult technical and economic conditions. This applies particularly to those areas of the processes industry, which are characterized by massive ecological and environmental load from mining, the metallurgy and the chemical industry. Current information technologies enable us to sense and record data from these processes in hard operation conditions by using new technical remedies in real time, the subsequent storing of the measurement data, their processing and evaluation in situ or in a laboratory. The article describes the use of a full profile tunnel boring machine Wirth TB-II-330H/M using TBM technology during the boring of an exploration gallery of the tunnel Branisko from the east side. According to the used technology it is a very expensive construction and that is the reason that is needed to ensure the fluent and fast course of work progress by maximum mechanism performance and effective work time use. During the boring the tunnel boring machine passed through many geological formations while recording variables like downforce, revolution, the torque of the boring head, power consumption and boring length. The system's monitoring of input and output variables of a tunnel boring machine-rock process system and calculating its key performance indicators (KPI) enable a contribution to the development, design and subsequent evaluation of static and dynamic system models. The indicators of the technological process were designed for visualization in an operator system in order to promptly evaluate, verify, and access data provided by the individual models.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
BC - Theory and management systems
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2016
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Proceedings of the 2016 17th International Carpathian Control Conference, ICCC 2016
ISBN
978-1-4673-8606-7
ISSN
—
e-ISSN
—
Number of pages
4
Pages from-to
25-28
Publisher name
IEEE
Place of publication
Piscataway
Event location
Tatranská Lomnica
Event date
May 29, 2016
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—