All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Deployment of technical diagnostics during commissioning of small pumped storage hydropower plant

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F17%3A10236369" target="_blank" >RIV/61989100:27230/17:10236369 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.scopus.com/record/display.uri?origin=resultslist&eid=2-s2.0-85032450784" target="_blank" >https://www.scopus.com/record/display.uri?origin=resultslist&eid=2-s2.0-85032450784</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.5593/sgem2017/42/S17.023" target="_blank" >10.5593/sgem2017/42/S17.023</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Deployment of technical diagnostics during commissioning of small pumped storage hydropower plant

  • Original language description

    This article is dedicated to issues of commissioning of a small pumped storage hydropower plant in mine. Pumped storage hydropower plants are one of several ways to solve the problem of non-constant power consumption from the mains. This hydropower plant, we are going to deal with in this article, is located at Jeremenko mine in Ostrava, 580 meters below the surface of the earth. The entire facility is composed of Pelton turbine, Bibi&apos;s coupling and a generator of electrical energy. There will be described the issues during commissioning as well as methods of technical nondisaassembly diagnostics to eliminate these, mainly mechanical problems. One of the problems during initial commissioning of this hydropower plant was low bearing life of Pelton turbine. These bearings worked only 3 hours of operation than occurred their destruction. One of the causes of this very short life of bearings, among others, misalignment of bearing housing, which even used bearings could not compensate. The article should point out the mistakes which is possible to commit on the device from many causes. © SGEM2017 All Rights Reserved.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20301 - Mechanical engineering

Result continuities

  • Project

  • Continuities

    N - Vyzkumna aktivita podporovana z neverejnych zdroju

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    SGEM 2017 : proceedings of the 17th International Multidisciplinary Scientific GeoConference : June 29 – July 5, 2017, Albena, Bulgaria. Volume 17. Issue 54

  • ISBN

    978-619-7408-11-9

  • ISSN

    1314-2704

  • e-ISSN

    neuvedeno

  • Number of pages

    8

  • Pages from-to

    175-182

  • Publisher name

    STEF92 Technology Ltd.

  • Place of publication

    Sofia

  • Event location

    Albena

  • Event date

    Jun 29, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article