All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

A Study of a Two Storage Single Product Inventory System with Ramp Type Demand, N-Phase Prepayment and Purchase for Exigency

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27230%2F23%3A10252406" target="_blank" >RIV/61989100:27230/23:10252406 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.mdpi.com/2227-7390/11/7/1728" target="_blank" >https://www.mdpi.com/2227-7390/11/7/1728</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3390/math11071728" target="_blank" >10.3390/math11071728</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    A Study of a Two Storage Single Product Inventory System with Ramp Type Demand, N-Phase Prepayment and Purchase for Exigency

  • Original language description

    This model considers a two-warehouse inventory system of deteriorated items with ramp-type demand and a constant rate of deterioration. It is maintained a rental warehouse (RW) of infinite capacity to load the excess items of replenished goods after filling the items of finite capacity in the own warehouse (OW). Retailers are encouraged to opt for the prepayment option of paying their purchase cost in equal installments prior to the delivery of the ordered items with a considerable discount, which will ensure the purchase guarantee of their orders. The slotted backlog interval of the stock out period is handled in two different ways to retain the customers and ease their impatience. Customers in the first slot of the stock out period are satisfied by the emergency purchases from local suppliers with high purchasing costs to avoid losing customers. Customers in the next slot are satisfied immediately after the next replenishment point. Essential measures of the system are derived: optimal ordering quantities from both regular and local suppliers; replenishment cycle length; and a partitioned backlog interval. A numerical example is given along with the optimal solutions for a particular environment with sensitive analysis in order to validate the model&apos;s efficacy.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20301 - Mechanical engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2023

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Mathematics

  • ISSN

    2227-7390

  • e-ISSN

  • Volume of the periodical

    11

  • Issue of the periodical within the volume

    7

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    17

  • Pages from-to

  • UT code for WoS article

    000969843200001

  • EID of the result in the Scopus database

    2-s2.0-85152785785