All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F20%3A10244907" target="_blank" >RIV/61989100:27240/20:10244907 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.mdpi.com/1996-1073/13/11/2736/pdf" target="_blank" >https://www.mdpi.com/1996-1073/13/11/2736/pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3390/en13112736" target="_blank" >10.3390/en13112736</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines

  • Original language description

    This paper presents the analysis of power supply restoration time after failures occurring in power lines. It found that the power supply restoration time depends on several constituents, such as the time for obtaining information on failures, the time for information recognition, the time to repair failures, and the time for connection harmonization. All these constituents have been considered more specifically. The main constituents&apos; results values of the power supply restoration time were analyzed for the electrical networks of regional power supply company &quot;Oreolenergo&quot;, a branch of Interregional Distribution Grid Company (IDGC) of Center. The Delphi method was used for determining the time for obtaining information on failures as well as the time for information recognition. The method of mathematical statistics was used to determine the repair time. The determined power supply restoration time (5.28 h) is similar to statistical values of the examined power supply company (the deviation was equal to 9.9%). The technical means of electrical network automation capable of the reduction of the power supply restoration time have also been found. These means were classified according to the time intervals they shorten.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20201 - Electrical and electronic engineering

Result continuities

  • Project

    <a href="/en/project/LTI19002" target="_blank" >LTI19002: The involvement of Czech research organizations in the Energy Research Alliance EERA</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2020

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Energies

  • ISSN

    1996-1073

  • e-ISSN

  • Volume of the periodical

    13

  • Issue of the periodical within the volume

    11

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    19

  • Pages from-to

    1-19

  • UT code for WoS article

    000545401100063

  • EID of the result in the Scopus database

    2-s2.0-85085945135