All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Ship to Shore Connection

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F22%3A10250142" target="_blank" >RIV/61989100:27240/22:10250142 - isvavai.cz</a>

  • Result on the web

    <a href="https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=9814144" target="_blank" >https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=9814144</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/EPE54603.2022.9814144" target="_blank" >10.1109/EPE54603.2022.9814144</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Ship to Shore Connection

  • Original language description

    The article focuses on the ship&apos;s electrical connection to the port, which appears to be an important technological element that will reduce air pollution in ports. Ports therefore install facilities that allow mooring ships to connect to the port distribution network. By 2025, this will be mandatory for all ports in Europe. That is why Shore Connection technology is experiencing a huge boom. All this means that in the future all ships staying in the port will have to be able to connect to the port and then power all their electrical appliances from the onshore distribution network. The ships will have to shut down their generators as soon as possible so that they no longer burn fossil fuels, which cause significant air pollution. Because ships near the port have to burn more expensive, greener fuels, it is often economically advantageous for them to connect to port distribution network. It is often cheaper for ships to buy electricity from the grid than to produce it with their own generators. Shore Connection must therefore be considered in the production of new ships, but this function is also being added on a large scale to already manufactured ships. This article discusses the most important devices that must be newly installed to connect to the port.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20201 - Electrical and electronic engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2022

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    2022 22nd International Scientific Conference on Electric Power Engineering (EPE 2022) : conference proceedings : Kouty nad Desnou, Czech Republic; 8-10 June 2022

  • ISBN

    978-1-66541-056-4

  • ISSN

  • e-ISSN

  • Number of pages

    4

  • Pages from-to

  • Publisher name

    IEEE

  • Place of publication

    Piscataway

  • Event location

    Kouty nad Desnou

  • Event date

    Jun 8, 2022

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000863000100019