All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

THE EVALUATION OF EFFICIENCY OF THE USE OF MACHINE WORKING TIME IN THE INDUSTRIAL COMPANY - CASE STUDY

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27360%2F17%3A10236595" target="_blank" >RIV/61989100:27360/17:10236595 - isvavai.cz</a>

  • Alternative codes found

    RIV/61989100:27730/17:10236595

  • Result on the web

    <a href="http://dx.doi.org/10.1515/mspe-2017-0034" target="_blank" >http://dx.doi.org/10.1515/mspe-2017-0034</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1515/mspe-2017-0034" target="_blank" >10.1515/mspe-2017-0034</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    THE EVALUATION OF EFFICIENCY OF THE USE OF MACHINE WORKING TIME IN THE INDUSTRIAL COMPANY - CASE STUDY

  • Original language description

    In the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    21100 - Other engineering and technologies

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Management Systems in Production Engineering

  • ISSN

    2299-0461

  • e-ISSN

  • Volume of the periodical

    25

  • Issue of the periodical within the volume

    4

  • Country of publishing house

    PL - POLAND

  • Number of pages

    5

  • Pages from-to

    241-245

  • UT code for WoS article

    000414631000003

  • EID of the result in the Scopus database