FEASIBILITY ANALYSIS OF USING THE MAUI SCHEDULER FOR JOB SIMULATION OF LARGE-SCALE PBS BASED CLUSTERS
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27740%2F18%3A10240302" target="_blank" >RIV/61989100:27740/18:10240302 - isvavai.cz</a>
Result on the web
<a href="http://www.iadisportal.org/ijcsis/papers/2018130204.pdf" target="_blank" >http://www.iadisportal.org/ijcsis/papers/2018130204.pdf</a>
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
FEASIBILITY ANALYSIS OF USING THE MAUI SCHEDULER FOR JOB SIMULATION OF LARGE-SCALE PBS BASED CLUSTERS
Original language description
For large-scale High Performance Computing centers with a wide range of different projects and heterogeneous infrastructures, efficiency is an important consideration. Understanding how compute jobs are scheduled is necessary for improving the job scheduling strategies in order to optimize cluster utilization and job wait times. This increases the importance of a reliable simulation capability, which in turn requires accuracy and comparability with historic workloads from the cluster. Not all job schedulers have a simulation capability, including the Portable Batch System (PBS) resource manager. Hence, PBS based centers have no direct way to simulate changes and optimizations before they are applied to the production system. We propose and discuss how to run job simulations for large-scale PBS based clusters with the Maui Scheduler. This also includes awareness of node downtimes, scheduled and unexpected. For validation purposes, we use historic workloads collected at the IT4lnnovations supercomputing center. The viability of our approach is demonstrated by measuring the accuracy of the simulation results compared to the real workloads. In addition, we discuss how the change of the simulator's time step resolution affects the accuracy as well as simulation times. We are confident that our approach is also transferable to enable job simulations for other computing centers using PBS.
Czech name
—
Czech description
—
Classification
Type
J<sub>ost</sub> - Miscellaneous article in a specialist periodical
CEP classification
—
OECD FORD branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Result continuities
Project
Result was created during the realization of more than one project. More information in the Projects tab.
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2018
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
IADIS International Journal on Computer Science and Information Systems
ISSN
1646-3692
e-ISSN
—
Volume of the periodical
13
Issue of the periodical within the volume
2
Country of publishing house
PT - PORTUGAL
Number of pages
15
Pages from-to
47-61
UT code for WoS article
000454419400005
EID of the result in the Scopus database
—