All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Life Cycle Cost Analysis in investment projects – Examination of case studies and risk mitigation with Monte Carlo Simulation

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F62156489%3A43110%2F25%3A43926175" target="_blank" >RIV/62156489:43110/25:43926175 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.22630/srees.9798" target="_blank" >https://doi.org/10.22630/srees.9798</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.22630/srees.9798" target="_blank" >10.22630/srees.9798</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Life Cycle Cost Analysis in investment projects – Examination of case studies and risk mitigation with Monte Carlo Simulation

  • Original language description

    This work focuses on life cycle cost (LCC) analysis in the German natural gas infrastructure and recommends strategies to mitigate the uncertainties and risks involved using Monte Carlo simulation (MCS). It deals with the impact of input data and predicting the future development of input data on the results of the LCC analysis and discusses MCS for risk mitigation. Seven case studies for investments in Germany&apos;s natural gas infrastructure are analyzed. In addition to the executed case studies, a case study from a scientific journal is included. The case studies were conducted between 2005 and 2015. Evaluation with real historical input data shows that the results of an LCC analysis depend on the reliability of input data and predictions on their development. The retrospective view shows that the best options are not always identified. Therefore, the results need to be validated using risk-mitigation methods, such as MCS. The executed case studies reflect the opinions of experts. This work shows how risk is mitigated through MCS while focusing on LCC analysis in the German natural gas infrastructure; however, the proposed risk mitigation with MCS can be adopted for other investment projects comprising capital expenditure (CAPEX) and operational expenditure (OPEX), for example, in construction, machines and other fields.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>SC</sub> - Article in a specialist periodical, which is included in the SCOPUS database

  • CEP classification

  • OECD FORD branch

    50204 - Business and management

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2025

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Przegląd Naukowy - Inżynieria i Kształtowanie Środowiska

  • ISSN

    1732-9353

  • e-ISSN

    2543-7496

  • Volume of the periodical

    34

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    PL - POLAND

  • Number of pages

    16

  • Pages from-to

    3-18

  • UT code for WoS article

  • EID of the result in the Scopus database

    2-s2.0-105002495074