All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Analysis of the model application of mechanical equipment for hydrothermal treatment at biogas plant

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F62156489%3A43210%2F16%3A43907723" target="_blank" >RIV/62156489:43210/16:43907723 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.4028/www.scientific.net/KEM.669.551" target="_blank" >http://dx.doi.org/10.4028/www.scientific.net/KEM.669.551</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.4028/www.scientific.net/KEM.669.551" target="_blank" >10.4028/www.scientific.net/KEM.669.551</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Analysis of the model application of mechanical equipment for hydrothermal treatment at biogas plant

  • Original language description

    The goal of the paper was to analyse model applications of mechanical equipment for hydrothermal treatment at biogas plant and impact on the operation of this production system. Alternative 1 was an alternative with a treatment output of 14 500 Mg of processed material, the annual electricity and heat total production of 4000 MWh respectively 3800 MWh, total capital expenditure of 40 000 000 CZK, unit capital expenditure of 2759 CZK per 1 Mg of processed biodegradable material and annual operating expenses of 19 371 000 CZK. The net present value (NPV) is 1 061 000 CZK, the internal rate or return (IRR) totals 4.9%, the simple payback time (Ts) is 12.6 years and the discounted payback time (Tsd) is 19.2 years. Alternative 2 employing the mechanical equipment proved a potential increase in the treatment output to 18 125 Mg, and an increase in the electricity and heat total production to 5000 MWh respectively 4800 MWh, thanks to the shortened intensification of the anaerobic fermentation process. At the same time, the total capital expenditure rose to 43 000 000 CZK, the operating expenses rose to CZK 24 213 000. The unit capital expenditure of alternative 2 amounts to 2372 CZK per 1 Mg of the of processed biodegradable material. The NPV totals 8 329 000 CZK, IRR is at 6.7%, the simple payback time (Ts) is 10.8 years and Tsd totals 15.3 years.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    GB - Agricultural machines and construction

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Key Engineering Materials

  • ISSN

    1013-9826

  • e-ISSN

  • Volume of the periodical

    669

  • Issue of the periodical within the volume

    3

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    9

  • Pages from-to

    551-559

  • UT code for WoS article

  • EID of the result in the Scopus database

    2-s2.0-84944754872