All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

In situ stress determination from excavation-induced stress by the compact conical-ended borehole overcoring method

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68145535%3A_____%2F16%3A00462327" target="_blank" >RIV/68145535:_____/16:00462327 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    In situ stress determination from excavation-induced stress by the compact conical-ended borehole overcoring method

  • Original language description

    The Compact Conical Borehole Overcoring (CCBO) method originally developed in Japan tondetermine stress in rock has been widely used by the Institute of Geonics, Czech Academy of Sciences. Only one borehole is required to install the CCBO instrument, measure strains and determine the full stress tensor in rock mass. To determine the pre-mining stress around the circular tunnel in undisturbed hard rock, the measurement requires a borehole of certain length to install the CCBO cell in location where the excavation does not affect the stress field.To reduce the drilling and installation costs, the Institute is developing new theoretical solutions for a short borehole strain measurement method enabling the CCBO cell installation closer to the circular tunnel. Thenproposed semi-analytical approach uses the short borehole strain measurement results, theoretical calculations of stress distribution in the elastic medium around the circular tunnel and numerical modelling, to back analyze the probable pre-mining stress tensor. This approach enables determination of pre-mining stress obtained from the short borehole strain measurements in excavation-induced zone around underground opening. Discussed here are the theoretical calculation methods, numerical modelling results and a practical example of the pre-mining stress determination from the short borehole strain measurements using the CCBO instrument.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20703 - Mining and mineral processing

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Rock Mechanics and Rock Engineering: From the Past to the Future

  • ISBN

    978-1-138-03265-1

  • ISSN

  • e-ISSN

  • Number of pages

    4

  • Pages from-to

    1203-1206

  • Publisher name

    CRC Press, Taylor and Francis Group

  • Place of publication

    London

  • Event location

    Cappadocia

  • Event date

    Aug 29, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000719660400085