All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Seismological Activity During Room and Pillar Hard Coal Extraction at Great Depth

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68145535%3A_____%2F17%3A00475754" target="_blank" >RIV/68145535:_____/17:00475754 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.sciencedirect.com/science/article/pii/S1877705817322956" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705817322956</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.proeng.2017.05.155" target="_blank" >10.1016/j.proeng.2017.05.155</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Seismological Activity During Room and Pillar Hard Coal Extraction at Great Depth

  • Original language description

    A first attempt of using the Room and Pillar mining method in the Czech Republic was implemented in the southern part of the Upper Silesian Coal Basin. This stratigraphical unit is well known for its complex geological structure with more than 40 main coal seams vertically distributed in the area of about 122 km2 of active mines and a complex slide/overlap fault system. The fact that the extraction of coal by this method is realised at a depth around 900 m below the surface has also made it one of the deepest Room and Pillar mining sites in the world. These facts brought lead to several questions. The main question connected to sustaining the safety of the workers before and after the advance of the mining works has resulted in this study of the prediction of unnatural seismological activity based on data that were collected during and after the excavation of the coal seam. Also, we ask whether the methods can be used for the prediction of inhomogeneous stress distributions in this kind of openings. Seismological monitoring, which is the main goal of this paper, was supplemented by stress and deformation measurements in coal pillars and surrounding rocks. More stations were added to the network of seismic stations of the coal mine at different levels surrounding the Room and Pillar site. We give the first results of the evaluation of seismic activity during the driving of the roadway in the first mining panel. We describe the site and mining conditions, details about seismological network, and a comparison of seismic activity with the gate driving advance and creation of coal pillars. This is compared to stress changes in the coal pillars.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20703 - Mining and mineral processing

Result continuities

  • Project

    Result was created during the realization of more than one project. More information in the Projects tab.

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Procedia Engineering - ISRM European Rock Mechanics Symposium EUROCK 2017

  • ISBN

  • ISSN

    1877-7058

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

    67-73

  • Publisher name

    Elsevier Ltd.

  • Place of publication

    Amsterdam

  • Event location

    Ostrava

  • Event date

    Jun 20, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000416996000009