Possibilities of using 3D laser scanning in geotechnical practise
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68145535%3A_____%2F19%3A00505395" target="_blank" >RIV/68145535:_____/19:00505395 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Possibilities of using 3D laser scanning in geotechnical practise
Original language description
We are experiencing the penetration of modern and smart technologies in all sectors of human activity, including mining and geotechnics. One of these technologies is 3D laser scanning, which has seen significant technological advancements over the last decade and has become an integral part of underground construction monitoring as a tool to enable comprehensive, accurate and unbiased capture of the spatial situation in digital form. This development was behind the fact that since 2013, 3D laser scanner has been used by the Institute of Geonics of the Czech Academy of Sciences as a necessary part of the geotechnical monitoring of mine works, when it is possible to precisely detect and quantify the time-space changes caused by man's intervention in the rock mass compared to the traditional established measuring methods. A leading project of recent years was the monitoring of the strain stress state of the rock massif during the 30th seam extraction during the trial operation of the Room and Pillar extraction method in the CSM Mine shaft safety pillar where, besides many other measuring instruments, 3D laser scanning was used for the convergence measuring of roadways, especially for capturing any deformation changes on the permanent pillars. A complementary function was the comparative evaluation with the results of other tools, e.g. with data measured by horizontal extensometers. The subject of the article will be a general description of the possibilities of using 3D laser scanning in geotechnical practice on spatial data acquired during the monitoring lasting almost 3.5 years, when important phenomena were detected in the movement of the pillar walls and the floor heave in the CSM Mine in the tens of cm, sometimes up to 100 cm.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20301 - Mechanical engineering
Result continuities
Project
<a href="/en/project/LO1406" target="_blank" >LO1406: Institute of clean technologies for mining and utilization of raw materials for energy use -Sustainability program</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Proceedings of the 14th International Conference Underground Construction Prague 2019
ISBN
978-80-906452-3-3
ISSN
—
e-ISSN
—
Number of pages
8
Pages from-to
—
Publisher name
Czech Tunnelling Association ITA-AITES
Place of publication
Praha
Event location
Praha
Event date
Jun 3, 2019
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—