Flood control of reservoirs
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F02%3A01079497" target="_blank" >RIV/68407700:21110/02:01079497 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
čeština
Original language name
Povodňové řízení nádrží
Original language description
The chapter interduces the real time control of reservoirs and it deals with the decision making model for flood control operation of a reservoir in conditions of stochastic uncertainty when the development of the flood is not known beforehand and only the short-term hydrological forecast is available. The decision model is based on the decision logic with the conditional IF-THEN rules by which current operational situations and discrete regulation actions are derived. The sensitivity analysis of the reliability of the forecasting model and comparison of the flood control in various conditions of uncertainty of input parameters are included. The decision-making model was tested on several historical floods on the Divoka Orlice river in the profile of the Pastviny dam.
Czech name
Povodňové řízení nádrží
Czech description
—
Classification
Type
C - Chapter in a specialist book
CEP classification
JM - Structural engineering
OECD FORD branch
—
Result continuities
Project
Result was created during the realization of more than one project. More information in the Projects tab.
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2002
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Book/collection name
Povodně: prognózy, vodní toky a krajina
ISBN
80-01-02561-6
Number of pages of the result
27
Pages from-to
189-215
Number of pages of the book
—
Publisher name
CICERO
Place of publication
Ostrava
UT code for WoS chapter
—