Reliable Construction Cost and Time Estimation on the basis of the Dynamic Flow-Chart (Software for Project Reliability Estimation and Risk Evaluation)
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F06%3A00120189" target="_blank" >RIV/68407700:21110/06:00120189 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Reliable Construction Cost and Time Estimation on the basis of the Dynamic Flow-Chart (Software for Project Reliability Estimation and Risk Evaluation)
Original language description
The contribution presents a simulation model that is able to calculate construction duration and cost for a building project depending on input parameters such as production speed, scope of work, time schedule, bonding conditions, maximum and minimum deviations from scope of work and production speed..
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
AH - Economics
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/1M0579" target="_blank" >1M0579: Centre for Integrated Design of Advanced Structures</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2006
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Advanced Engineering Design AED 2006
ISBN
80-86059-44-8
ISSN
—
e-ISSN
—
Number of pages
15
Pages from-to
—
Publisher name
ČVUT
Place of publication
Praha
Event location
Prague
Event date
Jun 11, 2006
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—