Risk of a high hydrostatic pressure on the tunnel Prague - Beroun
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F10%3A00175407" target="_blank" >RIV/68407700:21110/10:00175407 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Risk of a high hydrostatic pressure on the tunnel Prague - Beroun
Original language description
The construction of the Prague - Beroun high-speed railway tunnel is currently in the planning stage. This tunnelling project has no equivalent in the Czech Republic, the tunnel will be the longest Czech transport with the highest overburden exceeding 170 m above tunnel axis. Majority of tunnel is expected to be excavated by tunnel boring machines (TBMs). Risk analysis evaluating tunnel excavation and operations has been completed, possible high hydrostatic pressure was identified as one of major risks,thus its impact had to be evaluated. In current design phase the segmental tunnel lining is expected to be impermeable with
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2010
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
11th International Conference Underground Construction Prague 2010 Transport and City Tunnels
ISBN
978-80-254-7054-1
ISSN
—
e-ISSN
—
Number of pages
4
Pages from-to
—
Publisher name
Český tunelářský komitét ITA
Place of publication
Praha
Event location
Praha
Event date
Jun 14, 2010
Type of event by nationality
EUR - Evropská akce
UT code for WoS article
—