An open-pit coal mine in the Czech Republic is under reclamation which forms a large lake inside. One side-slope about 40 hectares is still not stable. The slope has two different parts. The upper one with a small inclination consists mainly of "virgin"ground not directly affected by mining. The lower part is a side slope formed by former stripping partly supported by an internal waste dump. A long anchored pile wall has been designed as a support of the upper part of the area. In the lower part a hugestabilisation embankment on the internal waste dump is under construction. The existing monitoring was extended in 2007 in order to prove efficiency of remedial measures. The embankment is instrumented and monitored with respect to its construction phases. Besides the control of the construction process, all gathered monitoring results are used for reverse analyses. A parameter study based on a link of knowledge gained by boring for site instrumentation, CPT applied for installation of
Czech name
Dvě zpětné analýzy stability založené na kontrolním sledování
Czech description
An open-pit coal mine in the Czech Republic is under reclamation which forms a large lake inside. One side-slope about 40 hectares is still not stable. The slope has two different parts. The upper one with a small inclination consists mainly of "virgin"ground not directly affected by mining. The lower part is a side slope formed by former stripping partly supported by an internal waste dump. A long anchored pile wall has been designed as a support of the upper part of the area. In the lower part a hugestabilisation embankment on the internal waste dump is under construction. The existing monitoring was extended in 2007 in order to prove efficiency of remedial measures. The embankment is instrumented and monitored with respect to its construction phases. Besides the control of the construction process, all gathered monitoring results are used for reverse analyses. A parameter study based on a link of knowledge gained by boring for site instrumentation, CPT applied for installation of
Classification
Type
C - Chapter in a specialist book
CEP classification
JN - Civil engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
Z - Vyzkumny zamer (s odkazem do CEZ)
Others
Publication year
2011
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Book/collection name
Přírodní katastrofy (optimalizace ochrany, interakce se stavebními konstrukcemi)
ISBN
978-80-01-04735-4
Number of pages of the result
8
Pages from-to
1-8
Number of pages of the book
200
Publisher name
České vysoké učení technické v Praze
Place of publication
Praha
UT code for WoS chapter
—