All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

GFRP BRIDGE DECK FOR TEMPORARY BRIDGE

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F12%3A00194566" target="_blank" >RIV/68407700:21110/12:00194566 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    GFRP BRIDGE DECK FOR TEMPORARY BRIDGE

  • Original language description

    The aim of the research is design and analysis of new bridge deck panel made of glass fibber reinforced polymer (GFRP). Use of GFRP in construction is rapidly growing in last few years. The reason for use GFRP is its low self weight in compare of strength and high resistance against weather influenced degradation resulting in long life. Using GFRP for the construction of the bridge deck leads to lightweight construction that can pass the required wheel load. Lightweight design is appreciated for temporary bridge which is expected to be transported and assembled often on places of current need. Long durability and resistance against weather degradation also reduces maintenance costs of bridge deck. Design of deck panel will be done on the base of loading experiments and FEM analysis. The main use of CFRP bridge deck panel is for temporary bridge but it is possible to extend its use on permanent or movable bridges.

  • Czech name

  • Czech description

Classification

  • Type

    O - Miscellaneous

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2012

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů