All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Probabilistic models for tunnel construction risk assessment

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00206326" target="_blank" >RIV/68407700:21110/13:00206326 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.sciencedirect.com/science/article/pii/S0965997813000355" target="_blank" >http://www.sciencedirect.com/science/article/pii/S0965997813000355</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.advengsoft.2013.04.002" target="_blank" >10.1016/j.advengsoft.2013.04.002</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Probabilistic models for tunnel construction risk assessment

  • Original language description

    The paper introduces different probabilistic models for prediction of tunnel construction risk. First, a simple probabilistic model for the estimation of the damage due to tunnel construction failures (e.g. cave-in collapses) is proposed. It can be usedin conjunction with a deterministic estimate of the construction time/costs as a support for decision-making in tunnel construction projects. The occurrence of failures is modelled as an inhomogeneous Poisson process. The model takes into account the heterogeneity of the environment along the tunnel (changing geological conditions, changing damage potential) and it includes the influence of common factors such as human and organisational aspects. The damages caused by the failures are modelled as uncertain and they are thus represented by full probability distributions in the model. Second, the decision-making under uncertainty in construction projects is discussed. The use of the concept of utility for considering the attitude of the s

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/TA01030245" target="_blank" >TA01030245: Tools for reliable design and construction of tunnels in urban development with emphasis on safety and lifetime</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2013

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Advances in Engineering Software

  • ISSN

    0965-9978

  • e-ISSN

  • Volume of the periodical

    62-63

  • Issue of the periodical within the volume

    Aug-Sept

  • Country of publishing house

    GB - UNITED KINGDOM

  • Number of pages

    13

  • Pages from-to

    72-84

  • UT code for WoS article

    000321419500009

  • EID of the result in the Scopus database