Analysis of Troja bridge under the terms of the project supervision
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00208062" target="_blank" >RIV/68407700:21110/13:00208062 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Analysis of Troja bridge under the terms of the project supervision
Original language description
The structure of the new Troja Bridge crosses the Vltava River in northern part of city centre. It connects central part of the city with the city ring road. The bridge has two spans ? the main span is crossing the river and is 200,4m long and the side span is 40,4m long. The main span is crossed over by steel network arch, which is extremely flat (rise/span ratio is 1/10), and by the suspended concrete deck with tie. The bridge bears two tram tracks, four road lanes and two pedestrian lanes. Under theterms of supervision the company Novák&Partner, Ltd. made computational analysis of the structure with respect to all construction stages and design of the construction process.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JM - Structural engineering
OECD FORD branch
—
Result continuities
Project
—
Continuities
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Others
Publication year
2013
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Arch 2013 - Proceedings of the 7th international conference on arch bridges
ISBN
978-953-7621-16-2
ISSN
—
e-ISSN
—
Number of pages
8
Pages from-to
555-562
Publisher name
SECON-CSSE
Place of publication
Zagreb
Event location
Trogir - Split
Event date
Sep 2, 2013
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—