Construction of the Troja Bridge in Prague
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F14%3A00228018" target="_blank" >RIV/68407700:21110/14:00228018 - isvavai.cz</a>
Result on the web
<a href="http://www.metrostav.cz" target="_blank" >http://www.metrostav.cz</a>
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Construction of the Troja Bridge in Prague
Original language description
Construction of the new Troja Bridge in Prague, description of the individual activities. The bridge has a main span 200.4 m long. The network arch structure is composed of the steel arch and the prestressed concrete deck. Now supports are loacated in the river.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
JM - Structural engineering
OECD FORD branch
—
Result continuities
Project
<a href="/en/project/FR-TI3%2F531" target="_blank" >FR-TI3/531: Improving of durability of concrete structures exposed to extreme loading</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2014
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
24. Dresdner Brückenbausymposium
ISBN
978-3-86780-369-4
ISSN
1613-1169
e-ISSN
—
Number of pages
15
Pages from-to
59-73
Publisher name
TU Dresden
Place of publication
Dresden
Event location
Dresden
Event date
Mar 10, 2014
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—