All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Agile PM and BIM: A Hybrid Scheduling Approach for a Technological Construction Project

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F15%3A00235847" target="_blank" >RIV/68407700:21110/15:00235847 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.sciencedirect.com/science/article/pii/S1877705815032099" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705815032099</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.proeng.2015.10.108" target="_blank" >10.1016/j.proeng.2015.10.108</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Agile PM and BIM: A Hybrid Scheduling Approach for a Technological Construction Project

  • Original language description

    This paper introduces synthesis of the Agile Project Management and Building Information Modeling in construction industry and its practical application with the accent on economic incentives of their implementation as the most significant factor. The executed synthesis of both concepts? features leads to the representation of the general process of integration, thereby the general development of integrated product and process model for addressing the on-site management phase of a construction project.That is when Building Information Modeling technology plays a key role in Agile method not only as the technological container for information model of a construction project, but as a new construction approach bringing in the additional benefits described in the literature.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Procedia Engineering

  • ISSN

    1877-7058

  • e-ISSN

  • Volume of the periodical

    123

  • Issue of the periodical within the volume

    October

  • Country of publishing house

    NL - THE KINGDOM OF THE NETHERLANDS

  • Number of pages

    8

  • Pages from-to

    557-564

  • UT code for WoS article

  • EID of the result in the Scopus database

    2-s2.0-84953214549