All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Numerical model of pillars made from masonry with and without mortar in perpend joints

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00243047" target="_blank" >RIV/68407700:21110/16:00243047 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Numerical model of pillars made from masonry with and without mortar in perpend joints

  • Original language description

    The calculation method for determination of load-bearing capacity of eccentrically compressed masonry walls and pillars included in ČSN EN 1996-1-1 [1] was originally developed for masonry with perpend joints fully filled by mortar. Currently, most of masonry load-bearing structures in the Czech Republic are made from clay blocks without mortar in the perpend joints. The paper summarizes the results of numerical analysis conducted with the aim to roughly compare the behavior of masonry pillars with filled and unfilled perpend joints under both vertical and horizontal loading. Planar FEM model created in ATENA Science software was used for the analysis. The results confirmed that the approaches contained in ČSN EN 1996-1-1 [1] are basically applicable for pillars with unfilled perpend joints as well.

  • Czech name

  • Czech description

Classification

  • Type

    O - Miscellaneous

  • CEP classification

    JN - Civil engineering

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů