All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Life Cycle Costing Within Infrastructure Projects

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00302456" target="_blank" >RIV/68407700:21110/16:00302456 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Life Cycle Costing Within Infrastructure Projects

  • Original language description

    Highways and roads are an important part of every country public assets, allowing movement between communities. As well as other types of infrastructure, roads infrastructure requires a proper procurement process. The purpose of this paper is to highlight the role of the life cycle cost criterion in deciding on the proposals of roads infrastructure projects. Public owners commonly use construction cost minimization. In order to achieve the maximum value for money all costs incurred over the whole life span must be evaluated. The optimization of the life-cycle cost of a project is essential for a complex decision-making process. Then, the solution with the minimum value of the life-cycle cost can be chosen. Life cycle costing (LCC) is a method of economic analysing of all costs related to constructing, operating, and maintaining a construction project over a defined period of time. Having the costs and savings public owner can then directly compared these areas and be fully informed when decisions are made. The greatest benefit of life cycle costing can be obtained in the initiation phase of construction projects. The paper presents the most frequently used methods of cost calculating. The paper also clarifies the necessary data and a suitable process of life cycle costing is proposed. The public sector may use the results of study to identify the ineffectiveness of procurement in the area of infrastructure projects in the Czech Republic. The proposed procedures should improve the efficiency of procurement and provide better decisions by the public agency.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2016

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Central Europe towards Sustainable Building 2016 - Innovations for Sustainable Future

  • ISBN

    978-80-271-0248-8

  • ISSN

  • e-ISSN

  • Number of pages

    8

  • Pages from-to

    1468-1475

  • Publisher name

    GRADA PUBLISHING

  • Place of publication

    Praha

  • Event location

    Prague

  • Event date

    Jun 22, 2016

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article