All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Utilization of Dynamic Simulation for Design and Optimization of PPP/PFI projects

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00314315" target="_blank" >RIV/68407700:21110/17:00314315 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.sciencedirect.com/science/article/pii/S1877705817330886?via%3Dihub" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705817330886?via%3Dihub</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.proeng.2017.07.216" target="_blank" >10.1016/j.proeng.2017.07.216</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Utilization of Dynamic Simulation for Design and Optimization of PPP/PFI projects

  • Original language description

    The Public Sector Comparator has a unique position in the process of public procurement of PPP/PFI projects (Public Private Partnerships/Private Finance Initiative). The Public Sector Comparator is an evaluation tool, which provides the public sector with complex information about the progress of total costs, incomes and risks during the life cycle of a PPP/PFI project. PSC is formed during the phase preceding competition of tenders. Its value serves as a measure for the public sector to compare against the bids offering investment solutions by means of PPP/PFI projects, and also to choose the most suitable project partner from the private sector. Present methods of calculation of the Public Sector Comparator are based on the formulation of an economic model of a PPP/PFI project with a simplification of the objective reality. This fact leads to problems linked to the interpretation of achieved results. Another difficulty of present methods is the rather static means of calculating the Public Sector Comparator. This situation offers the basis for a solution in an economic model of PPP/PFI project, and results in once-and-for-all decisions in a predetermined time frame. However, it is necessary to record the dynamics of a surveyed process. This paper presents a modified method for the calculation of the Public Sector Comparator which uses dynamic simulations during the initial assessment and pre-market stages of PPP/PFI project.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2017

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Procedia Engineering

  • ISBN

  • ISSN

    1877-7058

  • e-ISSN

    1877-7058

  • Number of pages

    8

  • Pages from-to

    399-406

  • Publisher name

    Elsevier B.V.

  • Place of publication

    Amsterdam

  • Event location

    Primosten

  • Event date

    Jun 19, 2017

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article

    000418465300052