LIFE CYCLE COST OF RAILWAY STRUCTURES
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00317678" target="_blank" >RIV/68407700:21110/17:00317678 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
LIFE CYCLE COST OF RAILWAY STRUCTURES
Original language description
The article deals with problems of Life Cycle Cost (LCC) for railway structures with a particular focus on railway switches. LCC in general evaluates costs connected to primary preparation right through to termination of the construction work itself. It facilitates the search for the optimum variant of a project solution within the whole life cycle. The need to optimize costs for construction and operation is more than ever in demand in the context of increasing energy prices and relentless pressure to find new cost reduction opportunities. The aim of the article is to show what way to proceed in any LCC calculation for this important railway structure. This is placed together with designs directed at total cost reduction which we can carry out in each designated stage.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2017
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Construction Maeconomics Conference (2017) Conference Proceedings
ISBN
978-80-01-06366-8
ISSN
—
e-ISSN
—
Number of pages
8
Pages from-to
—
Publisher name
České vysoké učení technické v Praze
Place of publication
Praha
Event location
Praha
Event date
Nov 1, 2017
Type of event by nationality
CST - Celostátní akce
UT code for WoS article
—