All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Categorization of Clashes and their Impacts on Construction Projects

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00322376" target="_blank" >RIV/68407700:21110/18:00322376 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.tf.llu.lv/conference/proceedings2018/Papers/N102.pdf" target="_blank" >http://www.tf.llu.lv/conference/proceedings2018/Papers/N102.pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.22616/ERDev2018.17.N102" target="_blank" >10.22616/ERDev2018.17.N102</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Categorization of Clashes and their Impacts on Construction Projects

  • Original language description

    The paper deals with problematics of clashes in construction projects. In the first part the general definition of a clash is described along with its origin, brief history and development in built environment and construction management using Building Information Modeling (BIM). The second part of the paper focuses on detailed categorization of clashes. Each category is based on its specific characteristics and algorithms of its detection process - Hard clashes are exclusively geometrically oriented, Soft clashes include implementation of a static buffer, 4D clashes are based on errors related to project schedule and Clashes of animated objects utilize dynamic buffer. Practical examples are also provided. In the third part, the impact of clashes on a project in construction industry is discussed. This offers an overview of how important collision control system is and why managers should focus on it. The relevancy of clashes is also interpreted by data achieved from publications and reports from actual projects. Next part of this paper deals with the problematics of resolving the clashes. It mentions different approaches of clash resolving and emphasizes important requirements for their proper application. Based on the conducted research, simple formulas, which could be used for quantifying efficiency of computer clash detection and for comparison with manual clash detection, are proposed. The final part of the paper contains conclusions and discussion about the issues described in the text of the paper.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2018

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Engineering for Rural Development, Proceedings of 17th International Scientific Conference

  • ISBN

  • ISSN

    1691-5976

  • e-ISSN

    1691-5976

  • Number of pages

    9

  • Pages from-to

    827-835

  • Publisher name

    Latvia University of Agriculture

  • Place of publication

    Jelgava

  • Event location

    Jelgava

  • Event date

    May 22, 2018

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article