All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Comparison of Different Cost Estimation Methods with use of Building Information Modelling (BIM)

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00322377" target="_blank" >RIV/68407700:21110/18:00322377 - isvavai.cz</a>

  • Result on the web

    <a href="http://www.tf.llu.lv/conference/proceedings2018/Papers/N154.pdf" target="_blank" >http://www.tf.llu.lv/conference/proceedings2018/Papers/N154.pdf</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.22616/ERDev2018.17.N154" target="_blank" >10.22616/ERDev2018.17.N154</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Comparison of Different Cost Estimation Methods with use of Building Information Modelling (BIM)

  • Original language description

    The paper deals with the topic of cost estimation methods with the use of Building Information Modelling (BIM) in construction projects. As BIM is trending in construction industry, and many countries make decisions to require BIM in public contracts, the demand for various utilization of digitized construction related data increases. One of utilization options is the use of BIM for quantification of construction projects production and for following cost estimation. The paper presents results of a research on possible methodologies for such BIM utilization. The methodology has not been established yet, as there are many various estimation systems with different requirements - e.g., cost estimation systems require a different structure, information models have different standards, country specific legislation requires different information, calculation formulas vary etc. The paper shows and explains different solutions for different cases in general, so the results are applicable for most of the different cost estimation systems throughout the world. The presented solutions are then compared to show their advantages and disadvantages for the purpose of possible implementation of new systems. Based on general methodologies, country or company specific steps may be taken to properly develop the working system for BIM data utilization in cost estimation processes. The paper ends with conclusions and discussions on further research and further harmonization of the mentioned cost estimation methods.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2018

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Engineering for Rural Development, Proceedings of 17th International Scientific Conference

  • ISBN

  • ISSN

    1691-5976

  • e-ISSN

    1691-5976

  • Number of pages

    7

  • Pages from-to

    843-849

  • Publisher name

    Latvia University of Agriculture

  • Place of publication

    Jelgava

  • Event location

    Jelgava

  • Event date

    May 22, 2018

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article