Design of Concrete Pavement in the Považský Chlmec Tunnel
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00322896" target="_blank" >RIV/68407700:21110/18:00322896 - isvavai.cz</a>
Result on the web
<a href="https://www.scientific.net/SSP.272.305" target="_blank" >https://www.scientific.net/SSP.272.305</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/SSP.272.305" target="_blank" >10.4028/www.scientific.net/SSP.272.305</a>
Alternative languages
Result language
angličtina
Original language name
Design of Concrete Pavement in the Považský Chlmec Tunnel
Original language description
The paper describes not only the issue of road structural layers according to the regulation TP098 Design of Cement Concrete Pavements on Roads, but especially on a specific example of a tunnel already built we demonstrate general particularities of road surfaces in road and highway tunnels. These are, in particular, engineering requirements on the subgrade and possibilities of its drainage, design of joints of the cement concrete pavement in relation to the tunnel lining design, ensuring the necessary long-term roughness of the road surface, design of entries of utility lines (cables, drains) below the road surface, structural details connected with placement of kerbs and channel drains, lay-bys, impacts of use of self-extinguishing road drainage components in the load bearing system of the tunnel lining and other seemingly independent structures, which, however, in the confined tunnel space influence each other substantially. The paper focuses also on construction of the individual road courses with a recommendation for measures to adopt in order to eliminate damage to the tunnel structures completed (in particular, pavements, channel drains and kerbs), coordination of the other works in the tunnel ensuring safety of all workers, logistics (transport of pavers and cement concrete mix) and other apparently tiny details, which result in safe and fast work when placing the road courses in a restricted tunnel space. In the paper, the authors have taken into account requirements of the road engineering segment and also geotechnical requirements and particularities of the tunnel construction and point out the necessity of a multi-professional approach to the design to achieve an optimal solution.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
<a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2018
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Solid State Phenomena
ISBN
978-3-0357-1284-1
ISSN
1662-9779
e-ISSN
—
Number of pages
8
Pages from-to
305-312
Publisher name
Trans Tech Publications
Place of publication
Uetikon-Zurich
Event location
Litomyšl
Event date
Nov 22, 2017
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—