Risk management during headrace tunnel reconstruction in Turkey

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00337487" target="_blank" >RIV/68407700:21110/19:00337487 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.ita-aites.cz/cz/" target="_blank" >https://www.ita-aites.cz/cz/</a>

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    Risk management during headrace tunnel reconstruction in Turkey

  • Original language description

    An operation of a hydro power project in North Turkey started in 2015. The project included 12 km long headrace tunnel. 8 km long lower (output) tunnel section was excavated by double shield (TBM technology) with 8.7 m ID. Due to problems with mechanised excavation, 4 km long upper (input) tunnel section was excavated as a counter drive conventionally by Drill and Blast (D&B) method with single shell lining generated from fibre reinforced sprayed concrete and rock bolts. Significant operational problems were observed in September 2016 (about 16 months after its commissioning). The flooded tunnel was initially investigated by underwater Remotely Operated Vehicle (ROV) which indicated significant collapses in the tunnel. An operation of the power station had to be stopped and water from a supply dam at the headrace tunnel inlet had to be discharged to enable dewatering and inspection of the headrace tunnel. Consequent investigation revealed three major collapses and many other various damages in the D&B section of the tunnel, significant damages were also observed in the tunnel section with segmental lining. Repair and strengthening of the tunnel was completed in October 2017 (about one year after detection of problems), a very fast tunnel re-opening was considered as a significant success taking into account scale of damages and access difficulties. This paper is focused on all activities associated with the tunnel repair.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Underground Construction Prague 2019

  • ISBN

    978-80-906452-3-3

  • ISSN

  • e-ISSN

  • Number of pages

    7

  • Pages from-to

  • Publisher name

    Česká tunelářská asociace ITA-AITES

  • Place of publication

    Praha

  • Event location

    Praha

  • Event date

    Jun 3, 2019

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article