Analysis of the Consolidation Rate of the Plaster Layer by Nanodispersions of Calcium Hydroxide and Paraloid B72 at the Premonstratensian Monastery in Teplá
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00339359" target="_blank" >RIV/68407700:21110/19:00339359 - isvavai.cz</a>
Alternative codes found
RIV/68407700:21110/19:00339456
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Analysis of the Consolidation Rate of the Plaster Layer by Nanodispersions of Calcium Hydroxide and Paraloid B72 at the Premonstratensian Monastery in Teplá
Original language description
Among the basic goals of restoration of historical plasters are their consolidation (ie improvement of mechanical properties), when the essence is the return of the binder to the structure of the material, fill the formed cavities and heal cracks and more. Reinforcement of degraded lime plasters is carried out by consolidants, which are mostly applied in the form of solutions, eg lime water, organosilicates or, thanks to the extraordinary properties, it is also possible to look for application of lime nanosuspensions in the field of conservation. The paper deals with the stabilization, conservation and strengthening of historic plaster layers by selected agents based on hydraulic lime (so called “nanolime”) and presents partial results of the NAKI II research project focused on the experimental in-situ research of consolidation of surface plaster layers at the Premonstratensian Monastery in Teplá.
Czech name
—
Czech description
—
Classification
Type
O - Miscellaneous
CEP classification
—
OECD FORD branch
20103 - Architecture engineering
Result continuities
Project
<a href="/en/project/DG16P02M055" target="_blank" >DG16P02M055: Research and development of materials, processes and techniques for restoration, preservation and strengthening of historic masonry structures, surfaces and systems for preventive care of heritage buildings exposed to anthropogenic and natural risks</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů