All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Arch Bridge Quality Control Plans

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F20%3A00332319" target="_blank" >RIV/68407700:21110/20:00332319 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.1007/978-3-030-24986-1_15" target="_blank" >https://doi.org/10.1007/978-3-030-24986-1_15</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1007/978-3-030-24986-1_15" target="_blank" >10.1007/978-3-030-24986-1_15</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Arch Bridge Quality Control Plans

  • Original language description

    The importance of infrastructure for economic development of countries and, it opens up the economy to grander, and bigger opportunities. Maintenance should be well-thought-out and be regarded as vital part any in-frastructure development in a country. The main goal of infrastructure maintenance is life sustainability of major assets. The right planning of maintenance is necessary for right moment of investment, as its premature or late implementation will lead to unnecessary costs and it may compromise the asset’s economic life duration. Different management systems developed across Europe leading to different choices and recommendations regarding maintenance actions. In order to overcome this issue a COST Action TU 1406 has proposed a guideline for standardization and development of quality con-trol plans for roadway bridges. As in all management systems the starting points is collection of available data, defining element identification and grouping, recognition of vulnerable zones, damage processes and failure modes. On the basis of the identified damage processes identification and evaluation of performance indicators (PIs) is conducted, followed by the se-lection and identification of key performance indicators (KPIs), taking into account owners’ demands, and finally creating Quality Control Plans (QCP) scenarios and comparing them by spider diagrams. The recommended proce-dure is applied on an arch concrete bridge in Check Republic.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20102 - Construction engineering, Municipal and structural engineering

Result continuities

  • Project

    <a href="/en/project/TE01020168" target="_blank" >TE01020168: Centre for Effective and Sustainable Transport Infrastructure (CESTI)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2020

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Advanced Technologies, Systems, and Applications IV -Proceedings of the International Symposium on Innovative and Interdisciplinary Applications of Advanced Technologies (IAT 2019)

  • ISBN

    978-3-030-24985-4

  • ISSN

    2367-3370

  • e-ISSN

  • Number of pages

    18

  • Pages from-to

    187-204

  • Publisher name

    Springer International Publishing

  • Place of publication

    Cham

  • Event location

    Sarajevo

  • Event date

    Jun 20, 2019

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article