All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Risk Management Plan for Long-term Power Blackout for Temelin Nuclear Power Plant

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F22%3A00361388" target="_blank" >RIV/68407700:21110/22:00361388 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21220/22:00361388

  • Result on the web

    <a href="https://doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd" target="_blank" >https://doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd" target="_blank" >10.3850/978-981-18-5183-4_R18-03-079-cd</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Risk Management Plan for Long-term Power Blackout for Temelin Nuclear Power Plant

  • Original language description

    The critical process of nuclear power plant safety is the reactor cooling. Therefore, from safety reasons, it is also necessary to consider scenarios of impacts of low probable unacceptable disasters. Analysis of data on operation of nuclear power plants showed that one of problems that creates critical situations is a long-term power black-out. The article identifies the risks associated with the existing way of refilling the cooling water for cooling-down of the unit on Temelín nuclear power plant, in the long-term blackout. It analyzes operating conditions and identifies critical points of cooling water supply process at long-term power blackout, i.e. problems of critical safety function. Based on real data, the paper shows the risk management plan for re-sponse process to problems, using the feed and bleed method, for extreme accident scenario caused by long-term power blackout.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    21100 - Other engineering and technologies

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2022

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Understanding and Manageing Risk and Reliability for a Sustainable Future

  • ISBN

    978-981-18-5183-4

  • ISSN

  • e-ISSN

  • Number of pages

    8

  • Pages from-to

    929-936

  • Publisher name

    Singapore Management and Sports Science Institute, PTE, LTD

  • Place of publication

    Singapore

  • Event location

    Dublin

  • Event date

    Aug 28, 2022

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article