Construction of the arch bridge in Cervena
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F25%3A00390633" target="_blank" >RIV/68407700:21110/25:00390633 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Construction of the arch bridge in Cervena
Original language description
The new railway bridge was built in Cervena, which replaced the old steel bridge from 1889. The cantilever method of construstion was used. The arch is made of reinforced concrete, the deck is prestressed.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
<a href="/en/project/FV20472" target="_blank" >FV20472: Application of high performance cementitious composites at rehabilitation of concrete structures</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2025
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
fib International Symposium on Concrete Structures: extend lifetime, limit impacts, 2025
ISBN
978-2-940643-29-5
ISSN
2617-4820
e-ISSN
—
Number of pages
7
Pages from-to
2766-2772
Publisher name
fib. The International Federation for Structural Concrete
Place of publication
Lausanne
Event location
Antibes
Event date
Jun 16, 2025
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—