All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Influence of User Electricity Load Profile and Calculation Time Step on the Photovoltaic System Balance

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F19%3A00332027" target="_blank" >RIV/68407700:21220/19:00332027 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21720/19:00332027

  • Result on the web

    <a href="https://iopscience.iop.org/article/10.1088/1755-1315/290/1/012082" target="_blank" >https://iopscience.iop.org/article/10.1088/1755-1315/290/1/012082</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1088/1755-1315/290/1/012082" target="_blank" >10.1088/1755-1315/290/1/012082</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Influence of User Electricity Load Profile and Calculation Time Step on the Photovoltaic System Balance

  • Original language description

    Realistic energy balance of photovoltaic system has a direct impact on realistic economic evaluation of operation costs for given building. To estimate the realistic electricity power profile with a short-time step, a generator based on appliances power, occupancy and external daylight presence has been developed and used for simulations. Generator allows to create different power profiles for the whole year (all days identical, workdays-weekends, 365 different days) with given time-step resolution (from 1 minute to 1 day). Paper presents and analyses the results from parametric simulations of PV production and building electricity loads balance with different times-steps. Monthly calculation approach used as a standard methodology for building performance evaluation significantly overestimates the solar fraction of PV systems. Only calculations with time steps shorter than 1 hour lead to results close to reality. A methodology for monthly balance correction to realistic results based on yearly PV production to building consumption ratio will be presented.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20704 - Energy and fuels

Result continuities

  • Project

    <a href="/en/project/LO1605" target="_blank" >LO1605: University Centre for Energy Efficient Buildings – Sustainability Phase</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Central Europe towards Sustainable Building (CESB19)

  • ISBN

  • ISSN

    1755-1307

  • e-ISSN

    1755-1315

  • Number of pages

    8

  • Pages from-to

  • Publisher name

    IOP Publishing Ltd

  • Place of publication

    Bristol

  • Event location

    Praha

  • Event date

    Jul 2, 2019

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article