All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Replacement of Ancillary Service Resources Lost during Decarbonization

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F22%3A00362874" target="_blank" >RIV/68407700:21220/22:00362874 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21730/22:00362874

  • Result on the web

    <a href="https://doi.org/10.1109/ICUMT57764.2022.9943491" target="_blank" >https://doi.org/10.1109/ICUMT57764.2022.9943491</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/ICUMT57764.2022.9943491" target="_blank" >10.1109/ICUMT57764.2022.9943491</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Replacement of Ancillary Service Resources Lost during Decarbonization

  • Original language description

    Decarbonization increases the need for ancillary services (AnS) but simultaneously decarbonization leads to the loss of power plants providing them. Renewable resources are not primarily designed to provide AnS. The separation of electricity generation from AnS provision is proposed and a concept of a hybrid power plant combining small generators and battery energy storage system (BESS) is introduced in this article. Technologies within such a power plant may be stopped and ready to start when AnS is currently not activated, which saves emissions. Delay in the start of turbines requires BESS support and represents a challenge for turbines scheduling and control/dispatch. The goal of this article is to describe uncertainties associated with the AnS provision and to propose suitable optimization methods and architecture of control algorithms.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20202 - Communication engineering and systems

Result continuities

  • Project

    <a href="/en/project/TK04020051" target="_blank" >TK04020051: Algorithms for operational planning and real time control of the Hybrid source of Ancillary services (Energy nest)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2022

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

Data specific for result type

  • Article name in the collection

    2022 14th International Congress on Ultra Modern Telecommunications and Control Systems and Workshops (ICUMT)

  • ISBN

  • ISSN

    2157-0221

  • e-ISSN

    2157-023X

  • Number of pages

    8

  • Pages from-to

    145-152

  • Publisher name

    IEEE Xplore

  • Place of publication

  • Event location

    Valencie

  • Event date

    Oct 11, 2022

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article