All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Thermal and structural analysis of W-7X first wall graphite tiles under direct NBI loads

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F25%3A00390613" target="_blank" >RIV/68407700:21220/25:00390613 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.1016/j.fusengdes.2025.115178" target="_blank" >https://doi.org/10.1016/j.fusengdes.2025.115178</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.fusengdes.2025.115178" target="_blank" >10.1016/j.fusengdes.2025.115178</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Thermal and structural analysis of W-7X first wall graphite tiles under direct NBI loads

  • Original language description

    Thermo-mechanical analysis of the Wendelstein 7-X neutral beam dump is presented focusing on failure phenomena resulting from strong impulsive thermal loading of the graphite tiles. One of the plasma heating systems of the Wendelstein 7-X stellarator is Neutral Beam Injection (NBI). There are two NBI boxes with currently a total injected hydrogen beam power of 7 MW and a pulse length up to 5 s. Each NBI box can be operated with four positive ion neutral injectors (PINI). A total of three PINIs were used simultaneously in the last operation campaign in 2022. NBI is highly important for the W7-X physics program, thus increasing NBI power is planned in the next operation phase. A portion of the NBI power passes through the plasma, creating a region of the first wall (FW) with a significantly increased heat load. This region, called the beam dump, could be a limiting factor for the NBI pulse length and thus it requires a precise remodeling of all constituents before the 2024/2025 operation phases to prevent repeated structural damage to this area. Since the graphite tiles are attached by multiple bolts to the CuCrZr heat sinks, the thermal expansion of graphite can induce significant stress in the graphite. The safety limiting factor is the induced thermal stress in the graphite tile due to the NBI beam power load. ANSYS Mechanical model was developed, including the bolted connections, and analyzed to examine the effect of the heat load on the FW components and to evaluate the maximal allowed duration of the NBI beam. A coupled transient simulation of the thermal and structural analysis is performed. The calculation used the NBI heat loads on the FW surfaces estimated by the BEAMS3D code. This paper presents the results of the numerical analysis and the related operating limits.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20305 - Nuclear related engineering; (nuclear physics to be 1.3);

Result continuities

  • Project

    <a href="/en/project/TS01030051" target="_blank" >TS01030051: Innovative shield against extreme heat fluxes in thermonuclear fusion and other plasma reactors</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2025

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Fusion Engineering and Design

  • ISSN

    0920-3796

  • e-ISSN

    1873-7196

  • Volume of the periodical

    218

  • Issue of the periodical within the volume

    115178

  • Country of publishing house

    CH - SWITZERLAND

  • Number of pages

    10

  • Pages from-to

    2987-2996

  • UT code for WoS article

    001502460400001

  • EID of the result in the Scopus database

    2-s2.0-105005831177